Hall of Justice - Major Systems Renovation
330 West Broadway, San Diego, CA 92101
Civic · Institutional
GenslerProject Description
Major systems renovation of the Hall of Justice, an occupied county civic and courts building in downtown San Diego. The renovation replaces aging building infrastructure (fire/life safety, mechanical and HVAC, electrical, plumbing, and low-voltage systems) along with architectural, accessibility, and code-compliance upgrades so the building meets current safety standards while it stays in use. Work included existing conditions surveys, as-built documentation, and construction documents in Revit and AutoCAD.
Role Responsibilities
- Produced construction documents and coordinated permit processing with the City of San Diego
- Developed as-built drawings and existing conditions documentation through field surveys
- Supported construction administration: site meetings, RFI responses, and submittal reviews
Project Phase(s)
Construction Documents, Construction Administration
Software Used
Revit, AutoCAD, Bluebeam Revu